Overall Project Plan

Project includes multiple streets throughout the City that will have basic road resurfacing (paving). In some areas additional work, such as new curb and gutter will be installed to improve drainage and poor underlying soils will be excavated and replaced with suitable material. Deep utilities (water and sewer) will not be replaced as an assessment of their condition and repair history indicates they will last the lifespan of the newly paved surface.

Access to driveways will be maintained as much as possible throughout the project except for properties where new curb and gutter will be installed, and also during the final paving operations.

The City intends to issue a further Paving Program tender for additional roads in early June.
 

Update: Week of August 7, 2017

To date there are 10 road paving projects completed by local contractor BA Blacktop, with many more scheduled to be wrapped up in August and early September including: College Way, Mount Connell Crescent and Edgewood Drive.

 

Project Update:  Week of June 26th, 2017


17th Ave S – 3rd St to 4th St S
Paving complete

Industrial Rd 3 
Paving complete

Brookview Crescent
Paving complete for Anderson Crescent. 7th Street South slightly delayed due to the removal of poor soils and the installation of ditches and culver to mitigate routine drainage problems

21st Avenue – South of 7th St S
Paving complete
 
16th Ave S – 7th St End          
Paving Complete
     
7th St S - 27th Ave to 34th Ave
Sidewalk upgrades underway with resurfacing work scheduled to being in early July

Summit Place
Work to start in July

College Way
Work to start in July

NEW STREETS ADDED TO PROGRAM (Work to Start in July and August)
24th Avenue – 2nd Street North to 2nd Street South
Mount Connell Crescent
18th and 19th Avenue South – 10th Street to End
Edgewood Drive
16th Avenue Cul-de-sac
Optional Streets (Budget and Resource Dependant):
27A Avenue – 3rd Street South to 7th Street South
29th Avenue – 3rd Street South to 7th Street South
17th Avenue South – South of 10th Street South

 

List of Current Roads

Contract 1:
17th Ave S - 3rd St to 4th St S
Industrial Rd 3
Brookview Crescent & 7th St S
21st Avenue - South of 7th St S
16th Ave S – 7th St End           
7th St S - 27th Ave - 34th Ave
Summit Place
College Way

Contractor
BA Blacktop
Office: 250-426-7205
  

Update: Week of May 29, 2017

Overall Project Update

17th Ave S – 3rd St to 4th St S
Paving complete. Minor landscaping and concrete work outstanding

Industrial Rd 3 
Bottom lift of pavement complete. Top list and intersection tie ins schedule for completion May 31st.

Brookview Crescent
Asphalt removed, section of new curb installed to improve drainage issues. Base gravel targeted week of May 29th and Paving targeted for week of June 5th

21st Avenue – South of 7th St S
Asphalt removed. Base gravel work underway. Paving targeted for June 2nd or 3rd.
 
16th Ave S – 7th St End          
Asphalt removed. Paving targeted for week of June 12th

7th St S - 27th Ave to 34th Ave
Work to start in July

Summit Place
Work to start in July

College Way
Work to start in July

Residents

Visitors

Relocation

Business

Our City

Contact Us

Get in Touch

(250) 426-4211

.(JavaScript must be enabled to view this email address)

In case of Emergency

Sign up for our eNewsletter
Current Weather
Tomorrow